Curley, Martin and Graham, Brian (2010) Value Management (VM) Systems in Construction – An investigation into the use of VM systems in a leading Irish contractor. Masters thesis, Waterford Institute of Technology.
Preview |
PDF
Martin_Curley.pdf Download (714kB) | Preview |
Item Type: | Thesis (Masters) |
---|---|
Additional Information: | This was for the final master project This is a placeholder note |
Depositing User: | Bryan Hallissey |
Date Deposited: | 09 Nov 2010 21:25 |
Last Modified: | 29 Mar 2024 00:02 |
URI: | https://repository.wit.ie/id/eprint/1594 |
Actions (login required)
View Item |